Abstract

This paper proposes a practical framework for choosing among different lean-based improvement programs in a one-machine environment and applies it in a company in the aeronautics industry. For the studied environment, i.e., a single machine and machining process bottleneck, the application of the proposed framework resulted in a potential 84.63 % improvement in lead time, which can be obtained by improving the mean time between failures by 1373 % and requires an effort of 5880 h. Alternatively, a 34.76 % reduction in lead time is also possible through a 1960-h investment in labor; this improves the coefficient of variation of repair time by 72 %. It is believed that the model proposed here can help managers in practice to quantify and choose between different options of lean-based improvement programs in single-machine or single-cell environments with flowshop standards and a predominant machine, which is typical of lean manufacturing systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.