Abstract

We propose a mixed integer nonlinear programming model for the design of a one-period planning horizon supply chain with integrated and flexible decisions on location of plants and of warehouses, on levels of production and of inventory, and on transportation models, considering stochastic demand and the ABC classification for finished goods, which is an NP-hard industrial engineering optimization problem. Furthermore, computational implementation of the proposed model is presented through the direct application of the outer approximation algorithm on some randomly generated supply chain data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.