Abstract

This research introduces a stochastic version of the multi-mode resource-constrained project scheduling problem (MRCPSP) and its mathematical model. In addition, an efficient multi-start iterated local search (MS-ILS) algorithm, capable of solving the deterministic MRCPSP, is adapted to deal with the proposed stochastic version of the problem. For its deterministic version, the MRCPSP is an NP-hard optimization problem that has been widely studied. The problem deals with a trade-off between the amount of resources that each project activity requires and its duration. In the case of the proposed stochastic formulation, the execution times of the activities are uncertain. Benchmark instances of projects with 10, 20, 30, and 50 activities from well-known public libraries were adapted to create test instances. The adapted algorithm proved to be capable and efficient for solving the proposed stochastic problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.