Abstract
This paper proves that the existence of a feasible schedule for a set of dependent tasks of unit execution times with release dates and deadlines on a limited number of processors is a fixed-parameter tractable problem. The parameter considered is the pathwidth of the interval graph associated with the time windows of the tasks. A fixed-parameter algorithm based on a dynamic programming approach is developed and proved to solve this decision problem.Fixed-parameter algorithms for the two classical problems P|prec,pi=1,ri|Cmax and P|prec,pi=1,ri|Lmax are then derived using a binary search. They are, as far as we know, the first fixed-parameter algorithms for these scheduling problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.