Abstract
A power system under goes frequent changes due to disturbances. If the power system survives after the disturbance it will be operating in a new steady state, in which one or more transmission lines may be over loaded. The over loading of the transmission line can be eliminated by generator rescheduling and/or load shedding. This paper proposes fuzzy inference system (FIS)-based algorithm for overload indication in transmission line. The system parameters such as line overload factor (OF) and transmission congestion distribution factors (TCDFs) are given as the FIS input. The output from the FIS indicates whether the line is overloaded or not. Then generator rescheduling/load shedding is done to relief the congested line. The effectiveness of the congestion clusters method for CM is discussed by formulating two objective functions. Rescheduling of generation is formulated as an optimisation problem with the objective of obtaining minimum cost and proposed objective of achieving minimum real power loss. Attractive features of genetic algorithm (GA) are used for solving the formulated problem with the objectives considered separately. The effectiveness of the proposed approach has been tested for 5 bus system, 30 bus systems in MATLAB environment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Mathematical Modelling and Numerical Optimisation
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.