Abstract

Cooling technologies adapting to expressway embankment in permafrost regions have been drawing increasing attention due to its greater permafrost degradation risk; however, none of them has been put into practice. In adaption to the main permafrost-associated challenges of the construction of the Gonghe-Yushu Expressway (GYE) embankment, some new combined cooling technologies were presented. In order to investigate the cooling performance of the newly-presented combined cooling technologies under the conditions of warm and degrading permafrost and wide expressway embankment, an 8.06 km long field embankment test was built along the GYE. In this paper, the configuration and in-situ monitoring systems of 2 newly-presented combined cooling technologies were introduced. Then the working state and cooling performances of the cooling technologies were analyzed through field monitoring data. The first 3 years' monitoring data showed that the ventilation slab (VS) and the heat-induced pavement (HIP) prolonged the lasting period of the natural convection inside the crushed-rock layer (CRL) respectively through decreasing the temperature at CRL top. The CRL embankment, the VS-CRL embankment and the HIP-CRL embankment performed efficiently in preventing an intense permafrost thawing. The field embankment test is expected to supply technical support for construction of other expressways in permafrost regions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.