Abstract

The new type of ultra-cold neutron source presently under construction at PSI requires the possibility of transporting the full high-intensity proton beam, currently 2 mA, for about 8 s every 800 s onto a spallation target located at the centre of the source. For this purpose, a fast kicker magnet with a rise time (5–95%) of 0.5 ms has been built. The required magnet and power supply have been manufactured at PSI and were installed during a shutdown. A first test of the fast beam switching process, however, for safety reasons with a reduced beam intensity of 20 μ A , was performed successfully.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.