Abstract
HeA new machine will not fail easily in the early stage of its useful life. This phenomenon is consistent with the fact that the optimal sequential preventive maintenance (PM) policy which has longer PM intervals in its earlier stage of lifetime. In this paper, we propose a failure-rate-reduction periodic PM model with delayed initial time in a finite time span. Then, the optimal periodic PM policy is developed by minimizing the expected total maintenance cost, which can have smaller expected total maintenance cost than the optimal policy of the original failure-rate-reduction periodic PM model. The algorithm of finding the optimal PM policy for the proposed PM model is developed. Finally, examples are illustrated to verify the optimal policies of the proposed new PM model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.