Abstract

Sulige gas field is a typical low-permeability reservoir in China. According to desert landform features along with the regional hydrologic feature and the existing fracturing technology and operational conditions, a factory-like fracturing method suitable for Sulige gas field is established to improve techniques and production organization. This method includes five key parts: (1) centralized water supply mode (water source well supply+artificial lake storage); (2) highly efficient fracturing process (two mature multi-stage fracturing technologies, sliding sleeve fracturing for vertical wells and open-hole packer fracturing for horizontal wells); (3) pipeline operation mode with seven procedures, including well drift and flushing perforation etc; (4) high efficiency operation equipment; (5) recovery of fracturing flow-back fluid. This method shortens the preparation and operation period of fracturing treatment and also relieves the pressure on environment. Pilot tests were carried out in 11 well groups in total. Sixty-seven stages of fracturing in 14 wells were successfully completed within 42 days, representing a reduction of fracturing operation cycle of more than 50%, and an encouraging improvement in efficiency.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.