Abstract

This paper presents a dynamically optimized fluctuation smoothing rule to improve the performance of scheduling jobs in a wafer fabrication factory. The rule has been modified from the four-factor bi-criteria nonlinear fluctuation smoothing (4f-biNFS) rule, by dynamically adjusting factors. Some properties of the dynamically optimized fluctuation smoothing rule were also discussed theoretically. In addition, production simulation was also applied to generate some test data for evaluating the effectiveness of the proposed methodology. According to the experimental results, the proposed methodology was better than some existing approaches to reduce the average cycle time and cycle time standard deviation. The results also showed that it was possible to improve the performance of one without sacrificing the other performance metrics.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call