Abstract
As manufacturers face fierce competition in the global market, responsiveness has become an important competitiveness factor in addition to quality and cost. One essential responsiveness strategy is to reduce product development and lead times by integrating assembly planning with supplier assignment. This paper addresses the problem of integrated assembly and supply chain design under lead-time constraints by formulating and solving an optimisation problem with minimal total supply chain costs. This new time-constrained joint optimisation problem belongs to an NP-hard resource-constrained scheduling problem. To model this problem effectively, we develop a novel Hyper AND/OR graph and apply it for integrating assembly and supply chain decisions. We also develop a dynamic programming model and associated algorithm in order to solve the integrated optimisation problem with pseudo-polynomial time complexity in practice. Numerical case studies validate that the methods developed can solve the integrated decision-making problem optimally and efficiently. This paper overcomes the limitations of previous studies on concurrent assembly decomposition and supplier selection, which optimises cost without time constraints. The models and results of this research can be applied to a variety of areas including assembly design, maintenance module planning and supply chain restructuring.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.