Abstract

We consider a scheduling problem in which the processing time of each job deteriorates, i.e. it increases as time passes after the release date of the job. We present a dynamic programming algorithm coupled with upper bounding and lower bounding techniques to compute exact solutions. We report on problem instances of different size and we analyze the dependence between the ranges to which the data belong and the computing time.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call