Abstract
AbstractBudgets and maintenance programs in fossil power plants are frequently set based on engineering judgment rather than a Probabilistic Risk Assessment (PRA). Fossil power plants seldom use PRA due to a lack of practical processes, especially when field reliability data are not readily available. In the absence of field data, using general industry data may not be right for conducting PRA for a given organization as the operation and maintenance conditions significantly vary between organizations. To have a successful PRA, an organization needs to use its own field data, and have an efficient process for its organization. Studies have suggested using field data provides a robust model and accurate results. Use of Reliability Block Diagrams for Reliability, Availability, and Maintainability analysis is not new. However, applications of these techniques are new to fossil power plants. In this paper, we propose a practical process by integrating several existing reliability techniques for fossil plants to apply PRA. The process was tested at many power plants, and the results aligned well with the actual values. The methodology outlined in this paper is a forward‐looking tool for managers to predict system reliability, and proactively develop maintenance plans and budgets.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.