Abstract

A new model for the dynamics of a cable-mass system representing the installation or retrieval of subsea equipment is analyzed. It considers a one-degree of freedom system, which is able to account for the variation of the cable’s length during the time, simulating the equipment laying or recovering process. Also, the cable’s mass is included in the analysis and the hydrodynamic forces are modeled by the Morison’s equation. The resulting nonlinear equation of motion is integrated over the time domain via a predictor-corrector Newmark β-method. Firstly, the proposed model is compared with an Orcaflex model on fixed and variable length scenarios. The results show that the proposed model give accurate solutions in comparison with the finite element model through all the depths evaluated, even at zones where superharmonic response occurs. Secondly, the influence of payout speed on the dynamics of the system is assessed. Here, the system presents a variation on the static and dynamic forces, especially at the resonance zone. Finally, an operational weather window is generated for a specific case, which shows that the acceptable sea states change depending on the laying or retrieval speed considered. This highlights the importance of using models that account for the payout speed when analyzing subsea equipment installation and retrieval operations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.