Abstract

Post Fukushima nuclear disaster, application of renewable energy operated integrated microgrid (IMG) into nuclear power plants for strengthening the station blackout (SBO) power supply becomes popular. The IMG powered emergency-SBO (EM-SBO) is a bidirectional power system which leads to substantial variation in fault current. On the other hand, as per the guidelines of nuclear regulatory authority, minimum protection scheme is to be provided for EM-SBO power system to avoid unnecessary tripping of the safety power system. This scenario is a challenging task and a serious concern to provide suitable protection mechanism. To address this issue, a dynamic hybrid protection (DHP) scheme (hybrid differential and adaptive overcurrent protection scheme) is proposed. The proposed DHP scheme has been validated in EMTP-rv and DigSILENT Power Factory simulation software followed by harmonics analysis through Simulink. Finally, the superiority of DHP scheme for IMG has been established.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call