Abstract
We estimate the marginal costs of road renewals as part of a social marginal cost scheme for road user charging. Within an analytical approach that mirrors the relationship between road deterioration, traffic load and road renewal, we use an accelerated failure time model for road pavement with the purpose to derive the effect from traffic increase on the length of road renewal cycles. Based on a comprehensive dataset for German motorways we fit a Weibull duration model with covariates such as traffic load from heavy vehicles as well as various control variables and derive the road deterioration elasticity with respect to heavy traffic. Similar to available studies for Sweden we find a deterioration elasticity below one, implying that Newbery’s (1985) fundamental theorem does not hold for the German motorway network. The shape parameter of the Weibull function indicates that there is an ageing or weathering effect, and higher traffic loads are not the sole factor impacting on shorter pavement lifetimes. Our estimations yield a marginal renewal cost, which makes up approximately 40% of the average renewal cost. It implies that road user charges based on marginal costs will not yield a sufficient revenue to cover total costs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.