Abstract
An effective way to solve the problem of wind power curtailment is to install heat storage (HS) facilities in CHP plants. However, the existing power grid does not have the ability to schedule the heat storage facilities. In this paper, we have developed the combined heat and power dispatching system to schedule the power plants as well as the heat storage facilities for the maximum effect of wind power accommodation. The results show that cooperating with the existing scheduling system, the combined heat and power dispatching system has fine-tuned the initial schedules with the adjustment of the heat storage facilities to achieve the desired effect of improving the wind power consumption. Meanwhile, the maximum heat storage amount of the HS facility that limits the capacity of increasing wind power accommodation. What's more, the capacity can be affected when the heat load varies seasonally owing to the external characteristics of the CHP unit.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.