Abstract

Chinese engineering team participated in the construction of several water conservancy and hydropower projects in areas which have differences in climate characteristics from China. Due to a lack of hydrological and climatic data and the absence of systematic design specifications in these areas, considering construction safety, most of the Chinese designs and constructions are based on the extreme values with the Chinese design codes. The S Project in Guinea established a rainfall-runoff model through open-source remote sensing satellite precipitation data and limited hydrological station measured runoff data,allowing to refine local hydrological data. Based on these data series, it was then possible to calculate flood control standards with more local hydrological characteristics in order to promote the progress of the project scientifically. In addition, combining the refined discharging curve of the outlet hole with the latest arc gate online monitoring technology, and the joint dispatch with the downstream hydropower station, permitted that the downstream K Hydropower Station created historic power generation in 2019 with significant economic and social benefits.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call