Abstract

In the light of the growing renewable energy generation, matching of electricity supply and demand has become increasingly challenging. By participating in demand side management programs, industry can contribute to counter this challenge. However, the frequent adjustment of operation conditions according to volatile electricity prices leads to additional dynamic loads for the equipment. In this work, a mixed-integer linear programming based discrete-time model is proposed for scheduling of a single air separation unit, explicitly considering fatigue of equipment occurring during transient operation. Besides constraints for describing the feasible region and the process dynamics, the model includes constraints for considering mechanical fatigue of some selected key equipment in a simplified way. The resulting model is applied to investigate the impact of mechanical constraints on the potentials of demand side management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.