Abstract
Abstract When receiving an urgent request from a smart grid, shutting down part of operating chillers directly in the air-conditioning system in a building can achieve immediate power reduction. However, no study has addressed how to determine the number of chillers/pumps to be shut down and how to regulate the load of retained equipment systematically during DR events. This paper presents a new approach to address these issues based on three schemes. A power demand optimization scheme predicts the building cooling demand and the power limiting threshold in response to a received DR request. A system sequence control resetting scheme determines the number of operating chillers/pumps to be retained. An online control/regulation scheme ensures the system power following the expected profile by regulating the total chilled water flow delivered to the building and therefore the chiller load. It also employs a cooling distributor to distribute chilled water to individual zones concerning different sensitivities/sacrifices to temperature increases. Case studies are conducted on a simulated dynamic building air-conditioning system. Results show that, during DR events, the proposed strategy can achieve the expected power reduction (i.e., about 23%) and also maintain acceptable zone temperature even though uncertainties exist in the prediction process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.