The outage of transmission lines, especially of multiple lines, could cause power network islanding. Traditional line outage distribution factors cannot be directly used for the power flow calculation under network islanding. This letter proposes a direct and fast two-phase method for calculating shift factors under network islanding by leveraging existing shift factors of base case (pre-contingency) network.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.