Abstract

An optimal design strategy is developed to control the bottleneck problem, and for optimal utilization of a finite capacity integrated assembly line system (consisting of a set of tandem workstations, a set of inspection stations, a loading station and an unloading station, lined by a material handling system). To develop the proposed design strategy, a stochastic optimization model is presented to allocate flexible facilities amongst a set of workstations, such that the throughput rate from the system is maximized, while the resulting probability of finding either a workstation or a transporter station blocked will be sufficiently close to zero. The proposed stochastic optimization model is a non-linear channce constrained mixed integer programming model which is transformed into a deterministic mixed integer programming model, and is solved by a branch and bound algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.