Abstract
This paper analyses a system subject to multiple dependent degradation processes. Degradation processes start at random times following a non homogeneous Poisson process and next dependently propagate. The growth of these degradation processes is modelled using gamma increments. We assume that the arrival of a new process to the system triggers the degradation rate of the processes present in the system. Under this framework, the analytic expression of the system reliability is obtained and bounds of the system reliability are also analyzed. Furthermore, the system is inspected at certain times. Information on the system health is recorded at these inspection times and the decision on performing maintenance actions on the system is taken at these times. We consider in this paper a dynamic inspection policy since the information that becomes available in an inspection time is taken into account to schedule the next inspection time. The maintenance cost for this system is dealt with the use of semi-regenerative process. Numerical examples are performed to illustrate the analytic expressions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.