Abstract

In this paper, we address a large-scale freight transportation problem for maximizing the profit of a carrier. We propose two solving algorithms using a decomposition of the problem into three main steps: construction of the network, filling vehicles with commodities and construction of the vehicle plannings. The resolution of these steps involves heuristic schemes, Mixed Integer Programming and Constraint Programming techniques. To evaluate the model and the solution algorithms, we produce instances based on a study of real-life data. The results show that the methods without transhipment provide solutions with a good computation time/quality trade-off.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.