Abstract
We study the joint problem of scheduling passenger and freight trains for complex railway networks, where the objective is to minimize the tardiness of passenger trains at station stops and the delay of freight trains. We model the problem as a mixed integer program and propose a two-step decomposition heuristic to solve the problem. The heuristic first vertically decomposes the train schedules into a passenger train scheduling phase and then a freight train scheduling phase. In the freight train scheduling phase, we use a train-based decomposition to iteratively schedule each freight train. Experimental results show the efficiency and quality of the proposed heuristic algorithm on real world size problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.