Abstract

The power plant preventive maintenance scheduling problem is presented in this paper. A new model and a decomposition­based solution methodology are proposed. The problem consists of ascertaining which generating units must halt production regularly in order to be examined for safety. It is of major importance because a failure in a power station may cause a general breakdown in an electric network. The main consequence is that the electricity demands of customers will not be satisfied in such cases. The problem is analysed under the operations research perspective as an optimisation issue. Benders’ decomposition technique is used to solve the model formulated. As an example, the obtained algorithm is applied to a real power plant setting. The final results are a schedule, which enables the efficient organisation of preventive maintenance, and the power to be produced by every plant over the time horizon considered.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.