Abstract

This paper addresses a method for solving two classes of production-transportation problems with concave production cost. By exploiting a special network structure both problems are reduced to a kind of resource allocation problem. It is shown that the resultant problem can be solved by using dynamic programming in time polynomial in the number of supply and demand points and the total demand.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.