Abstract
AbstractThe widespread use of biogas and biomass fuels in facility agro‐industrial parks has led to a significant increase in their carbon emissions. A day‐ahead optimal scheduling model for an integrated energy system (IES) is proposed, that considers the coupling of biomass and power to gas (P2G) to reduce carbon emissions during the operation of an industrial park. The proposed model incorporates the two evaluation indices of the economy of and carbon emissions by the IES of the park, and formulates and solves a multi‐objective optimization problem by using the ε‐constraint method. From among the solutions to the Pareto front, we choose the scheduling strategy that delivers the optimal performance in case of multiple objectives by using the fuzzy decision method. Finally, the validity of the proposed model was verified by considering the IES of an agriculture–industrial park in the northwest region of China.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.