Abstract

This paper considers a cutting and scheduling problem of minimizing scrap motivated by float glass manufacturing and introduces the float glass scheduling problem. We relate it to classical problems in the scheduling literature such as no-wait hybrid flow shops and cyclic scheduling. We show that the problem is NP-hard, and identify when each of the problem’s components are polynomially solvable and when they induce hardness. In addition, we propose a simple heuristic algorithm, provide its worst-case performance bounds, and demonstrate that the bounds are tight. When the number of machines is two, the worst-case performance is 5/3.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.