Abstract

In this article we consider a cumulative damage shock model under a periodic preventive maintenance (PM) policy. The PM is imperfect in the sense that each PM reduces the damage level by 100(1 – b)%, 0 < b < 1. A system suffers damage due to shocks and fails when the damage level exceeds some threshold. We derive a sufficient condition for the time to failure to have an IFR distribution. We also discuss the associated problem of finding the number of PM's that minimizes the expected cost rate.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call