Abstract

Dragline is highly capital intensive equipment to procure, operate and maintain in any surface mining operation. Given this, every second of operation of this capital intensive equipment is absolutely important. As such, it is imperative to optimize the overall cycle time of this equipment in order to reap the benefits of this equipment to the fullest extent. Even a small improvement in the total cycle time has a significant influence on the overall performance of machine. In this light, the present paper is an endeavour to critically analyze digging time segment of dragline operations. The paper presents real-time data for a dragline operating in one of the major opencast projects in India. Investigation indicates the influence of cutting depth, dimensions and geometry of the cut area, nature of material, degree of fragmentation and operator’s skills on the digging segment of dragline cycle time. Results have been illustrated in the form of figures, graphs and tables.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.