Abstract

In reliability engineering, component importance measures are used to prioritise components in a system for purposes such as reliability improvement and maintenance planning. Existing importance measures have paid little attention to the costs incurred by maintaining a system and its components within a given time period. Cost-effectiveness analysis, however, is critically important in increasingly competitive markets. This paper proposes a new cost-based importance measure which considers costs incurred by maintaining a system and its components within a finite time horizon. Possible extensions are discussed and examples are given to show the use of the new measure.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call