Abstract

Objectives: To optimize the duration of the project using fuzzy mathematical model. Methods/Statistical Analysis: In this, a case study is scheduled, and cost estimation is done. Scheduling is done using Microsoft Project (MSP), Critical Path Method (CPM) and Line of Balance (LOB). The efficiency of both the scheduling is assessed by critical path method. Estimation is carried out using the Centre line method. The schedule and cost estimate shows the difference with respect to the actual time consumed to construct and expenses. Findings: The difference in schedule was the result of improper scheduling techniques and estimation procedures. The cost is increased by 25% due to increase in the time delay. The critical activity in the project is identified and crashed to decrease the duration and calculated the crash cost. The critical activity in the final stages of work is crashed heavily to reduce the time of capital investment locked in the project. Application/Improvements: The fuzzy logic optimizing technique was used to create correlation between time and cost with high opinion to the point of approval of the project manager.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.