Abstract

The ramp events of photovoltaic (PV) generation will cause severe voltage variations in a distribution network. To address this issue, a two-stage robust optimization based intra-hour dispatch model is proposed for the coordination of the on-load tap changer and smart PV systems. Hence, the distribution network security can be ensured by adjusting substation voltage and controlling PV systems. Case study on 33-bus system verifies the effectiveness of the proposed model.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call