Abstract

The one-off characteristic of construction projects can bring on a high risk in a construction supply chain, and project quality risks can transmit along supply chains due to the techniques of continuity and benefit correlation between enterprises of a construction supply chain. In this paper, project quality risks fall into two categories: controllable risks and systemic risks. Then a two-stage risk transmission model is proposed to describe the transmission mechanism of controllable quality risks in construction projects. Finally, this study will also present alternative solutions for risk source and process control for controlling the transmission of controllable quality risks in a cooperative supply chain. The findings from the study provide useful references to the risk management of construction project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call