Abstract

We consider a continuous time–cost tradeoff problem with multiple milestones and completely ordered jobs. If a milestone is tardy, a penalty cost may be imposed. The processing times of jobs can be compressed by additional resources or activities that incur compression costs. The objective is to minimize the total penalty cost plus the total compression cost. We show that the problem is NP-hard, even if the compression cost is described as a concave function, and we present a pseudo-polynomial time algorithm for that case. Furthermore, we show that the problem is polynomially solvable if the compression cost function is convex.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.