Abstract
A model of an unrealable two-station production line with an interstation buffer storage and continuous material flow is presented. Differential equations and boundary equations are found to determine the steady-state probabilities. The differential equations are solved analytically. Closed-form expressions are developed for the system availability and expected level of buffer. Limiting behaviour of production rate and expected level of the buffer for balanced and unbalanced cases are observed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.