Abstract

Scheduling activities in concurrent product development process is of great significance to shorten development lead time and minimize the cost. Moreover, it can eliminate the unnecessary redesign periods and guarantee that serial activities can be executed as concurrently as possible. This paper presents a constraint satisfaction neural network and heuristic combined approach for concurrent activities scheduling. In the combined approach, the neural network is used to obtain a feasible starting time of all the activities based on sequence constraints, the heuristic algorithm is used to obtain a feasible solution of the scheduling problem based on resource constraints. The feasible scheduling solution is obtained by a gradient optimization function. Simulations have shown that the proposed combined approach is efficient and feasible with respect to concurrent activities scheduling.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.