Abstract

In this paper, we first describe a constraint generation scheme for probabilistic mixed integer programming problems. Next, we present a decomposition approach to the peak capacity expansion planning of interconnected hydrothermal generating systems, with bounds on the transmission capacity between the regions. The objective is to minimize investments in generating units and interconnection links, subject to constraints on supply reliability. The problem is formulated as a stochastic integer program. The constraint generation scheme, which is similar to Benders decomposition, is applied in the solution of the peak capacity expansion problem. The master problem in this decomposition scheme is an integer program, solved by implicit enumeration. The operating subproblem corresponds to a stochastic network flow problem, and is solved by a maximum flow algorithm and Monte Carlo simulation. The approach is illustrated through a case study involving the expansion of the system of the Brazilian Southeastern region.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.