Abstract

Motivation: More than 70% of accidents in the fleet are due to the "human factor" - a wide range of psychological and psychophysiological qualities of the person, which in some way affect the result of its operations. Statistics of major ship accidents in recent decades show that not a single element of the shipping system is aloof from them. That is ship crews, shipowners, charterers, consignees, classification societies and other organizations associated with maritime transportation form a “chain” of risk. The correct combination of human abilities and machine capabilities significantly increases the efficiency of the "person - machine" systems and determines the optimal use by a person of technical means for their intended purpose. Unfortunately, an adequate model that would allow both quantitative and qualitative optimization of the project team, especially in conditions of incomplete determination of the volume of work, today does not exist. In addition, the existing methods do not take into account the specifics of the formation and conditions for the implementation of projects by such teams as the ship's crew, namely the increased level of danger, the inability to make replacements during the voyage, the international composition, the language barrier, etc. In this context, the issue of human resources management as a basic element of achieving the efficiency of project implementation in the field of maritime transport is also urgent, which implies an emphasis on the problem of project-oriented management of crewing and activity of the crew of marine vessels. The issue of clarifying the role, importance and key elements of HRM strategies and policies in the implementation of these projects requires special consideration. The aim of the study is to develop methodological approaches for the forming of quantitative and qualitative composition and effective management of project teams, as a variable component of the project management system of marine vessels.Novelty: Develop methodological approaches for the quantitative and qualitative composition of project teams, as a variable component of the project team on the example of crews of marine vessels. The task of acceptability of the structure, quantitative and qualitative composition of the team was solved. The terminological base of project management was developed by more clearly defining the concepts of “project team” and “project management team”. The approach to the organization of the crewing company recruitment system to work on ships was proposed.Methodology and Methods: In this scientific research to achieve the objective and test the hypotheses suggested in the research paper was used: 1) project teams methodology in project management, in particular, the Project Management Institute Classification (2017) of types of teams in the organizational structure of complex projects and in their management and the taxonomy of SNCB Version 4.1 are designed to provide a comprehensive professional assessment of the level of training of project managers; 2) method for calculating the size of the project team is based on the condition of minimizing its number, which reduces operating costs for the implementation of the project by the Ringelmann effect is known - a formula that provides the ability to quantify and optimize the parameters of the project team; 3) the method of planning of the minimum crew of The International Association of Sea Pilots considering the role of the “human” element in preventing accidents and environmental pollution (the ISM Code and the STCW Convention 78/95 as amended).Data and Empirical Analysis: For the purpose of the study, data were collected and empirical analysis was conducted concerning the analysis of the accident rate of ships and crews for 2009-2019 (causes of accidents: damage to the case and mechanisms; clash; shipwreck and landing; fires and explosions; submergence; contact with the ground; varied; hostilities), that can have a result severe damage or loss of the ship.Policy Considerations: Human factor is the most important aspect that determines the efficiency of shipping development; maintaining of technical and technological processes of the ship puts certain requirements to the quantitative and qualitative composition of the team, deviation from which leads to the occurrence of certain risk events; formation of an effective model of ship's crew manning is the main link in ensuring effective shipping project management.

Highlights

  • For the purpose of a deeper and more comprehensive study and analysis of conditions and factors affecting the safety of the ship’s crew, 3 aspects are usually considered: 1) technical: reliability of the ship, its systems and mechanisms; 2) ergonomic: the ergatic system “man-machine” is considered, the mutual fitness of these elements, the functions that they perform; the conditions under which the desired efficiency and reliability of the system is achieved; 3) economic: how much money you need to spend to get a sufficient level of security.the result of the project will depend on its crew members much more than on the shipping company management team or other project stakeholders.1.1

  • The development and implementation of a projectoriented management strategy in the practice of an efficient crewing for marine vessels should take into account the directions of change and be implemented using new management technologies (Strack et al 2014), namely the development of strategies for the formation of competencies for the implementation of strategy, relevant organizational changes and the formation of a system of motivation according to a specific strategy (Blickstein et al 2016)

  • Despite the quite correct conclusion that the minimum crew of the vessel shall be based on the conditions for ensuring the safe operation of all ship systems and mechanisms

Read more

Summary

Introduction

For the purpose of a deeper and more comprehensive study and analysis of conditions and factors affecting the safety of the ship’s crew, 3 aspects are usually considered: 1) technical: reliability (reliability) of the ship, its systems and mechanisms; 2) ergonomic: the ergatic system “man-machine” is considered, the mutual fitness of these elements, the functions that they perform; the conditions under which the desired efficiency and reliability of the system is achieved; 3) economic: how much money you need to spend to get a sufficient level of security.the result of the project will depend on its crew members much more than on the shipping company management team or other project stakeholders.1.1. The result of the project will depend on its crew members much more than on the shipping company management team or other project stakeholders. Ship crews, shipowners, charterers, consignees, classification societies and other organizations associated with maritime transportation form a “chain” of risk. Everyone involved in the maritime enterprise, from personnel on board the ship to the director of the shipping company and the management of the national maritime administration, is responsible for the safety of navigation and must take the necessary measures to minimize the risks of existing threats (Futurenautics 2018; Ilina, Miloradov and Kovaltchuk 2019; Martin et al 2018; U.S Government Accountability Office 2003)

Objectives
Methods
Results
Discussion
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.