Abstract

ABSTRACTIn current practice, a verification strategy is defined at the beginning of an acquisition program and is agreed upon by customer and contractor at contract signature. Hence, the resources necessary to execute verification activities at various stages of the system development are allocated and committed at the beginning, when a small amount of knowledge about the system is available. However, contractually committing to a fixed verification strategy at the beginning of an acquisition program fundamentally leads to suboptimal acquisition performance. Essentially, the uncertain nature of system development will make verification activities that were not previously planned necessary and will make some of the planned ones unnecessary. To cope with these challenges, this paper presents an approach to apply set‐based design to the design of verification activities to enable the execution of dynamic contracts for verification strategies, ultimately resulting in more valuable verification strategies than current practice.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.