Abstract This paper presents the implementation of a computer system in a bus body assembly line in Colombia, South America. The sequencing of the assembly line was formulated as a Resource Constraint Multi-Project Scheduling Problem. The proposed solution method was a classical Genetic Algorithm which was adapted to handle the constraints of the production system. The algorithm is embedded into a computer application that calculates the weekly schedule. The implementation of the computer system, in use since 2007, has brought dramatic changes in the company. The percentage of on-time deliveries rose from 65% to 85% in about one and a half years. The improvements have happened not only in terms of numbers, but also in the organizational climate at the company. The senior management frequently adds new functionalities to the application and the system is becoming a small Materials Requirements Planning (MRP).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.