Abstract
To address various uncertainties appearing in the transmission expansion planning (TEP) problem, appropriate tools such as stochastic programming (SP) or robust optimization (RO) are required. On the other hand, both long-term (LT) and short-term (ST) uncertainties must be well captured to acquire the most reliable and robust solution. The current works model the LT uncertainty by RO and the ST uncertainty by SP, forming a two-stage adaptive robust optimization problem. In contrast, this paper presents a novel approach in which the SP and RO are simultaneously utilized to cope with each type of uncertainty, i.e., LT and ST uncertainty. Unlike the current methods with bilinear terms appearing in the subproblems, the trilinear terms appear in the objective function of the proposed approach, which are linearized accordingly. In addition, we propose a mixed-integer bilinear programming (MIBP) model to specify the rectangles used as uncertainty sets, which is further solved using Konno's algorithm. A standard column-and-constraint (CCG) generation solves the established tri-level structure. Two case studies are used to implement the formulation developed in this work. Results signify the effectiveness of the proposed method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.