Abstract

PurposeRisks in implementing green building (GB) projects have emerged as a significant obstacle for GB development, especially in developing countries. In recent years, both academics and construction practitioners have paid considerable attention to the risks associated with GB. In this study, the authors aimed to create a comprehensive risk assessment model that considers three crucial risk features: impact level, probability of occurrence and risk manageability.Design/methodology/approachIn the research, authors adopted the mean scoring and fuzzy synthetic evaluation method to assess GB risks. Based on expert assessments, this model can determine the significance of risk factors, risk groups and overall risk. Notably, this research applied the proposed model to assess GB risks in Vietnam by surveying 58 GB experienced professionals.FindingsThe findings revealed that GB risks are relatively high in Vietnam, implying that risk management is essential for GB projects to succeed. The results also showed that “lack of experience of GB designers” is the most critical factor, and “human resources risk in the design phase” is the top crucial risk group.Originality/valueThis study contributes a novel and practical model to help practitioners assess risks in GB projects. In addition, this research offers detailed GB risk evaluations in Vietnam and thus could be a valuable reference for construction practitioners and future studies.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.