Abstract

The Transmission part of the power sector is very much important as it deals with the huge losses of the complete power sector. Transmission substations play a key role in the power transmission process since the power generation at the power plants to the final stage at the consumer end utilization. The utmost care should be taken to protect these transmission substations as same as the care is taken to reduce the losses. The substation needs to be protected from blackouts which is the big problem of substations. For this, the substation high voltage equipment’s like GIS & Power Transformers are to be properly installed & energized according to the standards & care is taken for its maintenance. So, during the commissioning process which is after installation & before energization, there are different tests which are performed on high voltage equipment’s, especially the Gas Insulated Switchgear, in which the High Voltage & Partial discharge has huge impact as the ageing and the life time of GIS can be easily assessed & the GIS can be saved from the damage, tripping and the blackout of a substation. The procedure of the high voltage test and the partial discharge tests are clearly explained in this paper.

Highlights

  • Many equipment’s are present in the substation in which the high voltage equipment’s like Gas Insulated Switchgears & Power Transformers’ constitutes for the major part

  • Power Frequency Withstand Voltage Test Power frequency withstand voltage test which is known as high voltage test on the Gas Insulated Switchgear is performed so as to ensure the dielectric strength of the GIS, confirm that the equipment can be energized and is capable to withstand its limit of high voltage upon energization

  • Partial Discharge Partial discharge is defined as the partial sparking or partial bridging in the insulation medium between the two electrodes or conductors

Read more

Summary

INTRODUCTION

Many equipment’s are present in the substation in which the high voltage equipment’s like Gas Insulated Switchgears & Power Transformers’ constitutes for the major part. Gas Insulated Switchgear is unique high voltage equipment which has wide uses in the substations. It comprises of all the bay equipment’s like Circuit Breaker, Earth Switch, Disconnector Switch, Current Transformer, Voltage Transformer, Cable Chamber which are compacted & enclosed in SF6 gas.

DEFINITIONS
PREPARATION STEPS FOR HV TEST
HV / POWER FREQUENCY WITHSTAND TEST
AND DISCUSSION