Abstract

A comprehensive importance measure method of railway network components is proposed in this paper. First, the railway network construction method is developed based on the physical layout and travel time. The betweenness centrality and network efficiency are extended by combining the network topology and traffic flow to measure the link and node importance. Because single available measure cannot reflect the overall network component criticality, a comprehensive importance measure method is developed by using the weighted average value of the two metrics. Finally, the proposed method is applied to measure the link and node importance of Chinese high speed railway network. A complete picture of railway network component criticality is obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.