Abstract

ABSTRACT: Drilling mud loss is of crucial importance in drilling. Lost circulation will extend the well construction period, cause investment losses, and even cause serious downhole accidents. In the Mizhi block of Changqing Oilfield targeted by this research, serious leakage occurred in many wellbore drilling processes, which has seriously affected the development of the block and caused economic losses. This paper focuses the mud loss during the drilling process of more than 200 wells in the Mizhi block, and counts the key loss data such as the lost horizons, the amount of lost drilling fluid, the average leak rate, and the density of the drilling fluid, and fully analyzes the possible reasons of the lost circulation. Collecting logging data, modeling geomechanics of some key wells and formations and taking cores. Finally, the geomechanical model is established. Analyzing the logging data and the specific leakage situation, the leakage mainly comes from fracture, and the leakage horizons mainly locate at the bottom of the Liujiagou Formation, the entire interval of the Shiqianfeng Formation and the top of the Shihezi Formation. Most of the mud loss sections are sand-mudstone interbeds. Geomechanical analysis shows that the rock mechanical strength of the entire interval is difficult to support the stability of the wellbore under the drilling fluid density of 1.1 grams per cubic meter, but the block loss pressure is generally between 1.1 - 1.2 grams per cubic meter. Collapse and leakage coexist in the wellbore. This study gives the method of drilling fluid optimization, and gives the possible reasons for the leakage from the perspective of geomechanics, which has important guiding significance for the further development of the Mizhi block. 1. INTRODUCTION During drilling or completion operations, when the pressure of the effective drilling fluid density in the wellbore is greater than the formation pressure, the fluid will flow to the formation along the leakage channel around the wellbore, resulting in lost circulation. (MD Hashmat et al. 2016)Loss of circulation not only causes a large amount of drilling fluid loss, but also may cause a series of other drilling accidents, such as stuck pipe, blowout and even wellbore scrapped and other serious consequences.(Zhang et al.2016) Ultimately, it increases the non-operation time of drilling and causes huge economic loss. The time consumed to deal with lost circulation accounts for about 10% of drilling operation time, and the economic loss in drilling caused by lost circulation is as high as 2 billion US dollars every year.(Arshad Umar et al.2014) If the leakage appears in the reservoir, it will also cause reservoir damage, thus affecting the subsequent production of oil and gas. Therefore, lost circulation is regarded as one of the most complex and harmful accidents in drilling operations.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.