Abstract

AbstractThe floods in the Czech Republic in the last few decades have resulted in a significant number of bridges having to be rebuilt. Unfortunately, the work meant long‐term traffic closures for railway bridges, coupled with significant costs for renovation and for providing alternative transport services. As a result, the minimum clear headroom above the design flood level required for new bridges and for reconstructing existing bridges has been increased. This initiated a search for new approaches to designing individual parts of bridge crossings, aiming to comply with the stricter conditions. The research aims to decrease costs in comparison with the costs of raising the finished grade level of the railway, especially at places where adjacent sections such as railway stations etc. are connected.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.