Abstract
This paper offers a complete and verified model of DC trolleybus grids and examines the effect of the common modelling assumptions made in literature by using simulations, as well as bus and substation measurements from the grid of Arnhem, the Netherlands. An equivalent model for the overhead line impedance is offered taking into account the single line impedance, the supply and return lines, and the parallel connections between them. A case study shows that the feeder cables from the substations to the sections can be ignored, but only for certain substation power and feeder-line length ranges. On the other hand, the often-neglected regenerative braking, bus auxiliaries load, bilateral connections, and the exact nominal substation voltage are found to be crucial for the correct modelling of a trolleybus grid.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IEEE Transactions on Intelligent Transportation Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.