Abstract

Two heuristics for operational production planning in a chemical processing environment are compared, characterized by a single bottleneck machine, fixed batch sizes, sequence-dependent setup-times, as well as production and storage constraints. Performance of both heuristics is measured by means of simulation experiments in which the planning horizon is partially frozen and rolled a number of times, as would be the case in practical applications. Furthermore, demand uncertainty is simulated as well as the variability among setup times. The performance measure used is the total cost for executing a particular production plan over its entire planning horizon.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.